Highway 75 Dam
| Location | Parameter | Vertical Datum | Data Set Start Date | Data Set End Date/time (UTC) | Time Interval | File |
|---|---|---|---|---|---|---|
| Pool | Flow-In | -- | 10/1/1983 | 2/10/2026 12:00 | ~15Minutes | Download |
| Pool | Flow-Out | -- | 10/1/1983 | 2/11/2026 7:00 | ~15Minutes | Download |
| LeafGate | Flow | -- | 10/1/1983 | 2/11/2026 7:00 | ~15Minutes | Download |
| LowFlow | Elev | NGVD29 | 10/1/1983 | 2/11/2026 7:00 | ~15Minutes | Download |
| LowFlow | Flow | -- | 10/1/1983 | 9/12/2025 14:00 | ~15Minutes | Download |
| LowFlow | Elev | NGVD29 | 10/1/1983 | 2/11/2026 7:00 | ~15Minutes | Download |
| ServiceSpillway | Elev | NGVD29 | 10/1/1983 | 2/11/2026 7:00 | ~15Minutes | Download |